| VMS
1000 & 1500 |
VMS
Processes:: |
| Glow Discharge,
Pre-Treatment Plascoat® PECVD Base coat, Aluminum
Evaporation, Plascoat® PECVD Top Coating. |
| Substrate
material: |
| Any vacuum stable
material |
| Cycle
Time:: |
VMS
1000:12:00-15:00 minutes.*
VMS 1500: 15:00 -
18:00 minutes.*
*Substrate age, geometry and the time between maintenance
intervals (cleaning shields/changing of oil), can adversely
affect the cycle time. |
| Normal
Vacuum Operating Range: |
| 5x10-6 to 1.5
x10-4 mbar. |
| Vacuum
Coater Operating Environment: |
| 75
OF @ 50% RH or lower provide the optimum environment
for the fastest cycle times. |
| Substrate
material: |
| Any vacuum stable
material |
| Substrate
Condition: |
| Ideal conditions,
that yield the fastest cycle times, use parts directly
from the plastic injection molding press or base coating
line. |
| Power
Requirements: |
| 480V/3P/50 or
60 Hz @ 300 Amps, with a peak demand of 500 amps |
| Water
and Air: |
| 17
GPM (67.0 l/m @ 15-26oC), 80 psi (5.5 bar) |
| Tooling
Capacity: |
VMS
1000: Either eight (8) 430 mm (16.92 inches)
or six (6) 540mm (21.25 inches) planets with a total
length of 1000mm (42.52 inches)
VMS 1500:
Either eight (8) 430 mm (16.92 inches) or six (6) 540mm
(21.25 inches) planets with a total length of 1500mm
(59.05 inches) |